0 of 8 questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
0 of 8 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
How long prior to the start of a test should a mitigation system be in operation?
Radon resistant new construction features include all but which of the following?
What would be the most effective mitigation technique for a house built over a crawlspace foundation?
Which of the following descriptions would be a proper installation of an ASD system?
Which of the following descriptions would be an improper installation of an ASD system?
A Sump pit can not be used as the primary suction point for mitigation systems.
In a crawlspace application, the high density plastic used to cover the gravel or dirt floor must be sealed to the foundation walls to create a pressure field for the system to work properly.
Vent discharge points are to be directly vertically with no obstruction except for rain caps.